Ninety Months of Hull Protection from Nippon Paint Marine

The operator of a large 72,300 dwt container ship delivered in 2013 found Nippon slow friction LF-Sea hull coating was in excellent, pristine condition after more than 90 months of service. The box ship dry-docked for the first time in May 2021 after operating for seven and a half years. It dry-docked at a shipyard in the Far-East, where Nippon Paint Marine carried out a thorough coating performance assessment. Container ship after 90M, before washing.

무엇을 도와드릴까요?

지금 연락하여 귀하를 위한 최적의 솔루션을 논의하여 보세요.