Ninety Months of Hull Protection from Nippon Paint Marine

The operator of a large 72,300 dwt container ship delivered in 2013 found Nippon slow friction LF-Sea hull coating was in excellent, pristine condition after more than 90 months of service. The box ship dry-docked for the first time in May 2021 after operating for seven and a half years. It dry-docked at a shipyard in the Far-East, where Nippon Paint Marine carried out a thorough coating performance assessment. Container ship after 90M, before washing.

지금 상담해보세요?

귀사의 자산 보호를 위해 어떤 솔루션을 제공할 수 있는지 지금 바로 상담해 보세요.